Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    China inflation hits 1% in March as PPI turns positive

    April 10, 2026

    Bahrain and UK review regional tensions and economic risks

    April 10, 2026

    Abdullah bin Zayed, Kaja Kallas review UAE-EU ties

    April 10, 2026
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    Tunisia GazetteTunisia Gazette
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Tunisia GazetteTunisia Gazette
    Home » West Africa LNG Group Highlights Strategic Progress on Guinea LNG Project at Powering Africa Summit
    PR Newswire

    West Africa LNG Group Highlights Strategic Progress on Guinea LNG Project at Powering Africa Summit

    April 7, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    WASHINGTON, April 7, 2026 /PRNewswire/ — West Africa LNG Group (WALNG) highlighted continued momentum behind its Guinea LNG Project during the Powering Africa Summit in Washington, D.C., including engagements with senior officials from the Government of Guinea and the United States.

    Guinea's Minister of Energy, Mr. Laye-Sékou Camara (left), and U.S. Department of Energy Acting Assistant Secretary Tommy Joyce (right) at the Powering Africa Summit in Washington, D.C.

    During the Summit, the Minister of Energy of the Republic of Guinea, Mr. Laye-Sékou Camara, reaffirmed the Government’s commitment to advancing modern energy infrastructure to support the country’s rapidly expanding mining and industrial sectors. He emphasized the importance of reliable, scalable energy solutions in unlocking Guinea’s full economic potential, particularly across the bauxite and alumina value chain.

    “Guinea is committed to building a modern energy system that can support our industrial growth and fully unlock the value of our natural resources,” said Minister Camara. “Partnerships such as the Guinea LNG Project are central to delivering the reliable and scalable energy infrastructure required for the next phase of our economic development.”

    The Guinea LNG Project, being developed by WALNG in collaboration with the Government of Guinea, is designed to deliver a flexible and scalable LNG-based energy solution to meet this growing demand. The project will provide a reliable source of cleaner-burning fuel to power industrial operations, reduce reliance on heavy fuels, and support the broader development of Guinea’s energy ecosystem.

    During the Summit, Minister Camara met with U.S. Secretary of Energy Chris Wright and Acting Assistant Secretary Tommy Joyce of the U.S. Department of Energy, along with representatives from development finance institutions and private sector partners. These discussions underscored strong alignment between Guinea and the United States on strengthening energy security and advancing critical minerals supply chains through investment in enabling infrastructure.

    “The United States is committed to working with partners like Guinea to advance energy infrastructure that supports responsible resource development and long-term economic growth,” said Acting Assistant Secretary Joyce. “Projects like Guinea LNG demonstrate how energy and critical minerals can be developed together through mutually beneficial partnerships that strengthen supply chains while creating lasting value for both countries.”

    The project is advancing through key development milestones with the support of international partners and is expected to play a central role in underpinning Guinea’s next phase of industrial growth.

    “The Guinea LNG Project represents a foundational step in building the energy infrastructure required to support Guinea’s long-term industrial development,” said Patricia Moller, Chairman of West Africa LNG Group. “We are proud to be working alongside the Government of Guinea and U.S. partners to advance a solution that is both scalable and aligned with the strategic priorities of all stakeholders involved.”

    WALNG continues to engage with U.S. government agencies, development finance institutions, and private investors as it progresses toward final development and financing stages.

    Photo – https://mma.prnewswire.com/media/2950087/WALNG_Summit_Photo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/west-africa-lng-group-highlights-strategic-progress-on-guinea-lng-project-at-powering-africa-summit-302734402.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    TCL Celebrates its 100 Million Air Conditioner Units Milestone with Launch of New Smart Factory

    April 8, 2026

    Gotion Leads Launch of Europe-Africa Electric Logistics Corridor

    April 7, 2026

    CycleFlow powered by C2FO and IFC Launch Supply Chain Finance Platform in Nigeria, Transforming Access to Finance for Nigerian MSMEs

    April 2, 2026
    Latest News

    China inflation hits 1% in March as PPI turns positive

    April 10, 2026

    Bahrain and UK review regional tensions and economic risks

    April 10, 2026

    Abdullah bin Zayed, Kaja Kallas review UAE-EU ties

    April 10, 2026

    UAE president hosts UK PM for regional security talks

    April 10, 2026

    Gold steadies as markets watch US-Iran talks

    April 9, 2026

    Japan current account surplus hits $24.8 billion in February

    April 9, 2026

    Nikkei falls as caution returns to Tokyo stocks

    April 9, 2026

    China forex reserves fall in March to $3.34 trillion

    April 9, 2026
    © 2026 Tunisia Gazette | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.